Waiting for Godot

Samuel Beckett’s modern drama about two hobos, Vladimir and Estragon, monotonously passing time while waiting for their friend Godot (who never shows during the entire play) reminds me of another kind of meaningless waiting that I often observe in organizations.  “Waiting” is, of course, one of the seven wastes.   It’s not uncommon to see either workers or machines idle because of inconsistency in material or information flow.  But this is not the waiting I’m thinking of here.  I’m thinking of the waiting caused by managers or engineers who for one reason or another are disinclined to take action on improvement.  These folks are “waiting for Godot”, or as some persons have interpreted Beckett’s title, “waiting to go do it.” Here are some examples: 

Overheard from a design engineer:  “Yes, we agree there is a problem calibrating the existing product, but the employee suggestion doesn’t need to be implemented now because we’re correcting the problem on the new design.  Let’s just wait [for Godot] on this one.” 

The promise of the new design to fix all problems is alluring, but this delays the learning that would occur if the problem were addressed, even partially, at an earlier time.  Worse, this response is demoralizing to workers who essentially hear that their ideas are not important and they should continue to live in pain while the “big brains” solve the problem.  Lean thinking says, fix problems instantly.  No waiting.

From an office manager:“There’s no reason to change the manual filing system now, because version X.1 of our computer system will do this automatically.  It will be ready by next spring.” 

Given the legacy of computer system “enhancements” there is ample reason to be skeptical about this. It has the same liabilities as the previous example.  

Here’s a variation on that theme, this time from a manager: “The proposed patient scheduling solution fixes only 25% of the problem instances we’ve observed.  Let’s wait until we have a more complete solution.” 

This is a common reason for waiting to act, but why wait?

Lean thinking recommends “A 50% solution today is better than 90% six months from now.  We will learn from our incremental improvement and also progressively pare down the problem. 

Sometimes the waiting occurs on a larger scale.  Here is a comment from a plant manager: “Let’s not try to improve any of the floor layout until we move into the new plant next year.” 

Like the other comments above, this recommendation may be well-intentioned, but the result is many months of delay in learning about the process of layout improvement.  The manager’s rationale seems reasonable, but it’s exactly wrong.  I once heard a manager who had waited, reflect “If we’d practiced the new thinking before our move, we probably wouldn’t have even needed this new building.”  The learning that occurs through practice will inevitably result in a better new floor design and a smoother transition because everyone – managers, engineers and workers – will have a chance to understand why and how the improvements are made.  Practice is important.  Scrimmages and rehearsals lead to better performance.  Don’t wait. 

In the queue of urgent versus important tasks, lean implementation frequently falls down the list.  Hot orders, new product releases, computer system roll-outs, quality audits, year-end pushes and vacation schedules are common reasons to wait (for Godot). There are many more. We wait to be acted upon rather than to take action.  Beckett’s masterpiece ends pretty much as it begins, with this dialog:

Vladimir: Well, shall we go?

Estragon: Yes, let’s go.

They do not move.

After walking the factory floor with a company owner many years ago we discussed a serious safety hazard we had seen in his factory.  When he commented to me, “We need to fix that immediately,” I stood up to go back to the floor.  “Oh, no. Not now,” he said. I asked him what he meant by ‘immediately’ and he replied “Sometime in the next month.” 

What’s your definition of immediately?  Is someone in your organization waiting for Godot?    Share some examples with us.

O.L.D.

3 thoughts on “Waiting for Godot

  1. Ron

    Bruce,
    I was recently working with a client that had no jigs or fixturing for their assembly process. The assembler noted that it would be much easier to install dowel pins if they had a fixture that would allow the part to lay flat, we made a quick prototype that worked well. The manufacturing manager then took the prototype and declared that he would have the production model built out of aluminum, have it anodized and returned within a month….he never returned the prototype that made it easier that day!

    Reply
  2. Andrew Bishop

    How about the day before yesterday when a report came in from our offsite production area that walkways bridging a pipe race were cracking in several areas, presenting a safety hazard? Immediately = replaced by mid-afternoon, before access to those areas was required by operators. Pulled a maintenance man from an important project to address this urgent and important one. Picked up the box of decking screws myself on the way over!

    On the other hand, workers at the site had apparently observed this problem previously and not reported it . So, I guess Godot was in the wings for a while, at least, before making his appearance. Vladamir and Estragon have no place in safety culture, but we, as managers, have to take resposibility for having invited them to the party. Until everbody has “a very low tolerance for the current condition” (words of Isao Kato) our work is not done and we will be waiting for someone!

    Did you know that Estragon is French for tarragon? It’s still cold out but this perennial herb is already well up… not waiting for anyone!

    Reply
  3. Pingback: Indefinite Postponement | Old Lean Dude

Leave a Reply